Refrigeration supply project for the distribution center «Lenta»

Refrigeration supply project for the distribution center «Lenta»

In March 2015, STEP Group has carried out the refrigeration supply project for the distribution center of the company "Lenta". The complex includes the multi-temperature chambers with the area of 6000 sq.m.
On this facility, the refrigeration supply system installation has been executed including equipment installation with the total refrigerating capacity of 1.1 MW.
The special feature of this system is the own software for CRM master controllers and the individual dispatching and visualization system. For the accurate maintenance of the temperature conditions there was installed a control system managing the heating devices together with refrigerating units.
During the installation of this facility, STEP Group used the equipment of the leading European companies such as Onda (Italy), Danfoss (Denmark), Bitzer (Germany), Castel (Italy), Carel (Italy), and other manufacturing companies, reliability of equipment of which is confirmed by many years of service of such equipment.



© 1996—2024 STEP Group. Disclaimer.

Design by logoped